• LinkedIn
  • Facebook
  • Twitter
RetroFit Scotland
  • Home
  • About Us
  • Case Studies
  • Resources
  • News & Events
  • Contact

Filter Menu

  • View All
  • Domestic
    • Date of Construction
      • Pre-1919
      • 1919-1944
      • 1945-1965
      • 1966-1997
      • Post 1997
    • Date of Retrofit
      • 1980's
      • 1990's
      • 2000-2003
      • 2004-2007
      • 2008-2011
      • Post 2011
    • Property Type
      • Flat
      • Terrace
      • Semi-detached
      • Detached
      • Other
    • Fabric Type
      • Solid
      • Cavity
      • Non-trad Solid
      • Non-trad Cavity
      • Timber Frame
      • Other
    • Location
      • Urban
      • Suburban
      • Rural Settlement
      • Rural
      • Other/Mixed/Unknown
    • Retrofit Approach
      • Full Energy Efficient Refurbishment
      • Energy Efficient Upgrades
      • Conservation / Restoration
      • Study
      • Passivhaus
      • Remodelling / Conversion
      • Improved Living Conditions
      • Renewables
      • Extension / New-Build
      • Refurbishment
      • Resource Efficiency
      • Recycled Materials
      • Service Upgrades
      • Draughtproofing
      • Improved Access
      • Facade Retention
      • Structural Repairs
      • Energy Management
      • Occupant Engagement
      • Retainability
  • Non-Domestic
    • Date of Construction
      • Pre-1919 (4)
      • 1919-1944 (1)
      • 1945-1965 (1)
      • 1966-1997 (2)
      • Post 1997
    • Date of Retrofit
      • 1980's (1)
      • 1990's (1)
      • 2000-2003
      • 2004-2007
      • 2008-2011 (1)
      • Post 2011 (6)
    • Building End Use
      • Offices (2)
      • Healthcare
      • Education (2)
      • Industrial (1)
      • Tourism/Leisure (2)
      • Other (2)
    • Fabric Type
      • Solid (4)
      • Cavity
      • Non-trad Solid
      • Non-trad Cavity (1)
      • Timber Frame
      • Other (2)
    • Location
      • Urban (3)
      • Suburban (4)
      • Rural Settlement
      • Rural (1)
      • Other/Mixed/Unknown
    • Retrofit Approach
      • Full Energy Efficient Refurbishment (1)
      • Energy Efficient Upgrades (8)
      • Conservation / Restoration (1)
      • Study
      • Remodelling / Conversion (1)
      • Improved Working / Visitor Conditions (1)
      • Renewables
      • Extension / New-Build (2)
      • Refurbishment (3)
      • Resource Efficiency (1)
      • Recycled Materials
      • Service Upgrades (3)
      • Draughtproofing (1)
      • Improved Access (1)
      • Facade Retention
      • Structural Repairs (1)
      • Energy Management (1)
      • Occupant Engagement (2)
      • Retainability

FIND A CASE STUDY

Use the search box below to find our case studies, when you start typing it will automatically show you matching items.

Coltness High School, Wishaw

A complete makeover in North Lanarkshire has created a fully updated high school and external spaces. The project combines refurbishment and new build to provide a remodelled school of 11,987m for 800 pupils and 85 staff.

View this item

Edinburgh Castle, Edinburgh

Edinburgh Castle is one of the most popular tourist attractions in Scotland, consistently achieving the accolade of Scotland’s most visited paid attraction. It also encompasses a number of other uses including offices, military accommodation, spaces where conferences and events take place and workshops. This diversity of uses as well as the protected status of what is one of the country’s most iconic heritage structures all added up to present a unique challenge in terms of energy efficiency improvements.

View this item

John Brown Engineering, Clydebank

Improving the energy efficiency of the buildings on an industrial site through the use of Contract Energy Management. Works include roof replacement and lighting and heating upgrades.

View this item

Land, Sea & Islands Centre; Arisaig

An energy efficient upgrade to a 19th century, stone construction visitor centre which was suffering extensive heat losses. The main focus was to to deliver a 75% saving in operational CO2 emissions.

View this item

Leighton Library, Dunblane

The aim was to upgrade the property and improve its thermal performance using materials which were appropriate to the fabric of the building. It was decided that insulating the loft would be the most effective way of improving the energy performance of the building. In 2011 Historic Scotland awarded a grant to the Trustees to allow this work to take place.

View this item

Notre Dame Primary School, Glasgow

This remodelled large primary school houses the co-location of Notre Dame Primary School, St Peter’s Primary School, and Anderson Street Nursery into the buildings of the former Dowanhill Primary School in the West End of Glasgow.

View this item

SPACE Craigmillar, Edinburgh

Scottish Energy Centre joined CastleRock Edinvar whilst undertaking a feasibility study investigating the fabric improvements that can be achieved through by retrofitting envelope improvement system into a 1930’s building.

View this item

Telephone House, Edinburgh

Office refurbishment and continual energy monitoring using a BEMS

View this item

RetroFit Scotland

Quick Links

  • Latest News
  • Who We Are
  • Contact Us
  • Case Studies
  • Resources
  • T&C's
  • Cookies Policy
  • Privacy Policy

Follow Us

  • Twitter
  • Facebook
  • LinkedIn

Partners

Architecture and Design Scotland BRE Historic Scotland Scotland's 2020 Climate Group Edinburgh Napier University

© 2019 Retrofit Scotland.

Made by Screenmedia